LITTLE | LITTLE CONSTRUCTION

client login
February 18
  • email pageemail page

Floating Home Launched

posted by littlelittle on February 18, 2012

The Floating Home is resting in a temporary location in Port Townsend’s Point Hudson Marina. You can follow the story of the launch through the stories that appeared in the Peninsula Daily news and Port Townsend Leader. Anticipation built as we prepared to launch. The process halted overnight and resumed the next afternoon. It arrived at Point Hudson early in the morning of February 9th. Click one of the links to read the article and browse the Lake Union Floating Home page to see a photographic timeline of the construction including new photos.

The home will remain at Point Hudson for approximately another week as some interior work is completed including painting and built in furniture. Once the work is complete, and the weather cooperates, the home will be transported to Lake Union in Seattle. Once on site utilities will be connected and the home will be balanced.

Jeff Chew from the Peninsula Daily News produced this video about the launch of the home.

Tags
  • Floating Home
  • Peninsula Daily News
  • Port Townsend Leader
Comments 0

Leave a Comment

Cancel reply

We will never share or publish your email. Required fields are marked *.

*

*

Archive

  • May 2012 (1)
  • April 2012 (1)
  • March 2012 (1)
  • February 2012 (2)
  • January 2012 (2)
  • December 2011 (4)
  • November 2011 (5)

Connect

  • Facebook
  • Twitter

Newsletter Sign Up

  • Home
  • Portfolio
  • About
  • Contact
  • Blog
  • Links + Affiliates